Project Statistics
- Site: .88 Acres (38,419sf)
- Building square footage: 35,000sf
- # Levels: 2 floors + basement
- Structure: Steel frame with a steel and wood framed roof
- Exterior Finishes: Stucco, Concrete, Glass
- Total Project Cost: $29 Million
- Building Opening: September 2014
Building Program
- Studio spaces
- Classrooms
- Joint-use work areas
- Flexible gallery/assembly/future studio space
- Permanent gallery
- Lecture hall
- Courtyard
- Flexible outdoor terrace
Project Team
- Architecture/Project Lead: wHY
- Structural: Thornton Tomasetti - 310.665.0010
- MEP: Stantec (formerly IBE) - 818.305.3266
- Civil: Magnusson Klemencic Associates - 206.292.1200
- Landscape: EPT Design - 626.795.2008
- Acoustical: Veneklasen Associates - 310.450.1733
- Lighting: George Sexton Associates - 202.337.1903
- Waterproofing: Roofing Waterproofing & Forensics Inc.(RWFI) - 714.970.7400
- Vertical Transportation: Lerch Bates - 818.957.4524
- Door Hardware: Assa Abloy Muscat, Shari - www.assaabloydss.com
- Code Consultant:AON Fire Protection Engineering - 213.630.2020
- Contractor: Hamilton Construction - 909.594.7523